S-Curve Antique Brass and Dimpled Amber Globe Light
S-Curve Antique Brass and Dimpled Amber Globe Light
SKU: SKU: 159-17998 EAN:| EAN: 5056547512242
Out of stock
Couldn't load pickup availability

Couldn't load pickup availability
Delivery within 1-2 working days
15 day returns. 30 days for members. Register













Description
Product Overview
Looking for a statement light that adds a touch of vintage charm? Our S-Curve light features an eye-catching antique brass finish and dimpled amber glass globes. Available in 2, 3 or 4 globe options, you can choose the perfect size to suit your space. It’s dimmable too, provided you use dimmable bulbs, so you can create the right ambience at any time.
Key details at a glance:
- Dimensions (2 globe): 490mm (L) x 265mm (W)
- Dimensions (3 globe): 590mm (L) x 260mm (W)
- Dimensions (4 globe): 810mm (L) x 260mm (W)
- Compatible bulbs: Golf ball
- Lamp holder type: E27 Edison Screw
Perfect for:
- Dining rooms: Adds character and creates a warm glow
- Hallways: Makes a striking first impression
- Living rooms: Brings warmth to family living spaces
- Bedrooms: Adds some character to the bedroom
For more details, see the full technical specifications on the corresponding tab.
Specifications
Name | S-Curve Antique Brass and Dimpled Amber Globe Light |
Product Code | 159-17998 | 159-179980 | 159-179981 |
Power | Max 40W/Bulb |
Power Source | Hardwired |
Voltage | 220/240V AC 50/60Hz |
Lamp Holder Type | E27 Edison Screw (ES) |
Lamp Holder Quantity | 2 | 3 | 4 |
Protection Class | Class I |
Dimmability | Dimmable if used with dimmable bulbs |
Light Source | Bulb |
Compatible Bulbs | Golf Ball |
Bulbs | Bulb not included |
IP Class | IP20 |
Mount Type | Semi Flush |
Product Dimensions (LxWxH) (DxH) | 490x265mm | 590x260mm | 810x170x260mm |
Product Length | 490mm | 590mm | 810mm |
Shape | Arm |
Made Of Materials | Steel, Glass |
Product Colour | Antique Brass, Amber |
Paint Type | Electroplated |
Shade Material | Glass |
Size Of Shades | 135x120mm | 130x110mm | D130x120mm |
Shade Colour | Amber |
Size Of Rose | D120x20mm |
Operating Temperature (C) | -20/+45C |
Warranty | 3 year |
Net Weight | 0.55kg | 0.76kg | 0.95kg |
Gross Weight | 0.94kg | 1.2kg | 1.53kg |
Box Dimension (LxWxH) | 420x260x160mm | 540x260x16mm | 770x260x160mm |
Box Content | 1 pc Light Fixture, User Manual, Accessories Package | 1 pc Light Fixture, User Manual, Accessories Package | 1 pc Light Fixture, User Manual, Accessories Package |
Pieces/Box | 1 |
Certifications | UKCA, CE, RoHS |
Delivery
SHIPPING
UNITED KINGDOM
Zone 1
(England, Wales, and Scotland) : SAME DAY DISPATCH*: Order between Monday to Friday before noon and get your order dispatched the same day. Generally, your order will be delivered in one to two business days after dispatched.
Orders placed after Friday noon and before Monday noon will be delivered Tuesday.
* Orders over £40 are free. Orders between (£0-£39.99) are flat £5 shipping fee.
Zone 2
(Northern Ireland, Highlands, Islands) : STANDARD FREE DELIVERY** : 2-4 business days.
** Orders over £40 are free. Orders between (£0-£39.99) are flat £5 shipping fee.
Orders placed on a weekday (before noon.) will be dispatched the same day.
Orders placed on weekends(after noon) and bank holidays will be dispatched the following working day.
Note: In case of returns for orders which cart value more than £40, Shipping fee might be deducted if new cart value is less than £40.
Solution partners: DPD, Royal Mail, DX, FedEx, Parcel Force
- Choosing a selection results in a full page refresh.
- Opens in a new window.